Work Update
Weathersfield Route 12/131
AOT Project No: STP 2913(1)
Saturday, 9/14/13 – Crews will be working on Route 131 grading and filling pot holes throughout the project.
Week of September 16th, 2013
Traffic Safety Warning – Crews are asking motorists who are exiting
driveways or businesses on Route 131 to be aware that they may be
pulling into a construction zone. With construction zones taking up to a
mile of one lane, a flag person may not be stationed in the exact area
to assist someone in pulling out. If there is no flagger present,
motorists should wait for traffic flow in the direction they want to go
before pulling out.
The construction zone will be marked with orange cones along the centerline.
VT Route 12 – I91 Interchange to NH Border
Guardrail crews will be working in various areas between the I91 interchange and the NH border.
Work will continue on installing curbing and adjusting catch basins in anticipation of final paving.
VT Route 131 – I91 Interchange to Downer’s Corners
Crews will also be delivering gravel and grading in various areas along Route 131 throughout the week.
Cement Reclamation – Crews will begin cement reclaiming the roadway
from I91 to Downers Corner’s along Route 131 throughout the week.
Similar to the reclaiming of the existing pavement, cement reclaiming
consists of rototilling dry cement into the existing loose gravel
roadway, then rolling the surface leaving the roadway a packed down
gravel surface. Motorists are encouraged to reduce speed and use
caution when driving over the gravel roadway.
Ascutney Notch
Road to Downer’s Corners – Guardrail crews will be working on removing
adjusting the location of the guardrail in anticipation of the
gravel/grading work.
TRAFFIC DELAYS – ALL operations will
require travel to be reduced to alternating one-way travel around the
construction packages. Traffic control personnel will be present to
assist in maintaining traffic flow. Motorists should anticipate traffic
delays while traveling through the project and plan accordingly.
Please allow for extra time in your travel plans.
Contact
Francine Perkins, Public Relations Officer, FRP Enterprises, LLC with
any questions or concerns with regards to the project at 802-479-6994 or
for a more up to date schedule visit www.roadworkupdates.com.
Work Update
Weathersfield Route 12/131
AOT Project No: STP 2913(1)
Saturday, 9/14/13 – Crews will be working on Route 131 grading and filling pot holes throughout the project.
Week of September 16th, 2013
Traffic Safety Warning – Crews are asking motorists who are exiting driveways or businesses on Route 131 to be aware that they may be pulling into a construction zone. With construction zones taking up to a mile of one lane, a flag person may not be stationed in the exact area to assist someone in pulling out. If there is no flagger present, motorists should wait for traffic flow in the direction they want to go before pulling out.
The construction zone will be marked with orange cones along the centerline.
VT Route 12 – I91 Interchange to NH Border
Guardrail crews will be working in various areas between the I91 interchange and the NH border.
Work will continue on installing curbing and adjusting catch basins in anticipation of final paving.
VT Route 131 – I91 Interchange to Downer’s Corners
Crews will also be delivering gravel and grading in various areas along Route 131 throughout the week.
Cement Reclamation – Crews will begin cement reclaiming the roadway from I91 to Downers Corner’s along Route 131 throughout the week. Similar to the reclaiming of the existing pavement, cement reclaiming consists of rototilling dry cement into the existing loose gravel roadway, then rolling the surface leaving the roadway a packed down gravel surface. Motorists are encouraged to reduce speed and use caution when driving over the gravel roadway.
Ascutney Notch Road to Downer’s Corners – Guardrail crews will be working on removing adjusting the location of the guardrail in anticipation of the gravel/grading work.
TRAFFIC DELAYS – ALL operations will require travel to be reduced to alternating one-way travel around the construction packages. Traffic control personnel will be present to assist in maintaining traffic flow. Motorists should anticipate traffic delays while traveling through the project and plan accordingly. Please allow for extra time in your travel plans.
Contact Francine Perkins, Public Relations Officer, FRP Enterprises, LLC with any questions or concerns with regards to the project at 802-479-6994 or for a more up to date schedule visit www.roadworkupdates.com.
Weathersfield Route 12/131
AOT Project No: STP 2913(1)
Saturday, 9/14/13 – Crews will be working on Route 131 grading and filling pot holes throughout the project.
Week of September 16th, 2013
Traffic Safety Warning – Crews are asking motorists who are exiting driveways or businesses on Route 131 to be aware that they may be pulling into a construction zone. With construction zones taking up to a mile of one lane, a flag person may not be stationed in the exact area to assist someone in pulling out. If there is no flagger present, motorists should wait for traffic flow in the direction they want to go before pulling out.
The construction zone will be marked with orange cones along the centerline.
VT Route 12 – I91 Interchange to NH Border
Guardrail crews will be working in various areas between the I91 interchange and the NH border.
Work will continue on installing curbing and adjusting catch basins in anticipation of final paving.
VT Route 131 – I91 Interchange to Downer’s Corners
Crews will also be delivering gravel and grading in various areas along Route 131 throughout the week.
Cement Reclamation – Crews will begin cement reclaiming the roadway from I91 to Downers Corner’s along Route 131 throughout the week. Similar to the reclaiming of the existing pavement, cement reclaiming consists of rototilling dry cement into the existing loose gravel roadway, then rolling the surface leaving the roadway a packed down gravel surface. Motorists are encouraged to reduce speed and use caution when driving over the gravel roadway.
Ascutney Notch Road to Downer’s Corners – Guardrail crews will be working on removing adjusting the location of the guardrail in anticipation of the gravel/grading work.
TRAFFIC DELAYS – ALL operations will require travel to be reduced to alternating one-way travel around the construction packages. Traffic control personnel will be present to assist in maintaining traffic flow. Motorists should anticipate traffic delays while traveling through the project and plan accordingly. Please allow for extra time in your travel plans.
Contact Francine Perkins, Public Relations Officer, FRP Enterprises, LLC with any questions or concerns with regards to the project at 802-479-6994 or for a more up to date schedule visit www.roadworkupdates.com.