Pages

Friday, September 6, 2013

Route 131 Paving Project Update - 9/6/13

Posted: 06 Sep 2013 09:09 AM PDT
Fri, Sep 6, 2013 at 10:12 AM
10:12 AM
 

Weathersfield Work Update for Wk of 9/9/13
from Francine Perkins to 19 recipients


  • jfp1999@myfairpoint.net" href="http://us-mg6.mail.yahoo.com/neo/launch?.rand=02r9h1n4uf82c#" tabindex="0" dir="" style="color:rgb(69, 69, 69);outline:0px;display:block;padding:2px 8px 3px;margin:0px;border:0px;background-color:transparent;font-family:Helvetica, Arial, sans-serif;cursor:pointer;font-size:12px;line-height:12px;white-space:nowrap;overflow:hidden;-webkit-background-clip:padding-box;border-bottom-left-radius:4px;border-top-left-radius:4px">jfp1999@myfairpoint.net to your Contacts [Shift+A]" style="color:rgb(69, 69, 69);outline:0px;display:block;padding:2px 8px 3px;margin:0px;border:0px;background-color:transparent;font-family:Helvetica, Arial, sans-serif;cursor:pointer;font-size:12px;line-height:12px;white-space:nowrap;overflow:hidden;background-attachment:scroll;-webkit-background-clip:padding-box;border-bottom-right-radius:4px;border-top-right-radius:4px;background-position:50% -319px;background-repeat:no-repeat no-repeat">


  • tclerk@weathersfield.org" href="http://us-mg6.mail.yahoo.com/neo/launch?.rand=02r9h1n4uf82c#" tabindex="0" dir="" style="color:rgb(69, 69, 69);outline:0px;display:block;padding:2px 8px 3px;margin:0px;border:0px;background-color:transparent;font-family:Helvetica, Arial, sans-serif;cursor:pointer;font-size:12px;line-height:12px;white-space:nowrap;overflow:hidden;-webkit-background-clip:padding-box;border-bottom-left-radius:4px;border-top-left-radius:4px;border-bottom-right-radius:4px;border-top-right-radius:4px">
  • townmgr@weathersfield.org" href="http://us-mg6.mail.yahoo.com/neo/launch?.rand=02r9h1n4uf82c#" tabindex="0" dir="" style="color:rgb(69, 69, 69);outline:0px;display:block;padding:2px 8px 3px;margin:0px;border:0px;background-color:transparent;font-family:Helvetica, Arial, sans-serif;cursor:pointer;font-size:12px;line-height:12px;white-space:nowrap;overflow:hidden;-webkit-background-clip:padding-box;border-bottom-left-radius:4px;border-top-left-radius:4px;border-bottom-right-radius:4px;border-top-right-radius:4px">
  • hwy@weathersfield.org" href="http://us-mg6.mail.yahoo.com/neo/launch?.rand=02r9h1n4uf82c#" tabindex="0" dir="" style="color:rgb(69, 69, 69);outline:0px;display:block;padding:2px 8px 3px;margin:0px;border:0px;background-color:transparent;font-family:Helvetica, Arial, sans-serif;cursor:pointer;font-size:12px;line-height:12px;white-space:nowrap;overflow:hidden;-webkit-background-clip:padding-box;border-bottom-left-radius:4px;border-top-left-radius:4px;border-bottom-right-radius:4px;border-top-right-radius:4px">

Work Update
Weathersfield Route 12/131
AOT Project No:  STP 2913(1)

Saturday, 9/7/13 – Crews will be reclaiming the existing roadway between Gulf Road (W) and Downer’s Corners.  This section will not be complete by the end of the day.  They will return later in the week to finish.
Pike will be monitoring the reclaimed (gravel) roadway over the weekend and applying water for dust control.
Week of September 9th, 2013
Traffic Safety Warning – Crews are asking motorists who are exiting driveways or businesses on Route 131 to be aware that they may be pulling into a construction zone.  With construction zones taking up to a mile of one lane, a flag person may not be stationed in the exact area to assist someone in pulling out. If there is no flagger present, motorists should wait for traffic flow in the direction they want to go before pulling out.
The construction zone will be marked with orange cones along the centerline. 
VT Route 12 – I91 Interchange to NH Border
Crews will be rebuilding traffic islands at the junction of Routes 5/12/131.  This work will extend through the end of the week and will require alternating one-way traffic at various times.  Traffic control personnel and Uniformed Officers will be present to assist in maintaining traffic flow.
VT Route 131 – I91 Interchange to Downer’s Corners
Henry Gould Road – Tuesday/Wednesday - Crews will be lining the culvert at Henry Gould Road.  This work may extend into the evening hours in an effort to complete the lining process. 
Access to Henry Gould Road will remain CLOSED while crews are working on the Culvert. Motorists are encouraged to use Ascutney Notch Road to access Henry Gould Road.
Gulf Road (w) to Downer’s Corners – Reclaiming will continue mid-week through the end of the week in an effort to complete the reclamation work on the project.  Reclaiming consists of rototilling the existing milled pavement leaving the roadway a gravel surface.  Motorists are encouraged to reduce speed and use caution when driving over the gravel roadway.
Thrasher Road to Henry Gould Road – Guardrail crews will be working in various areas throughout this area. 

I91 Interchange west to Jarvis Road – Grading/Gravel – Monday through mid week, crews will be delivering gravel to the project and grading to reshape the roadway. 
TRAFFIC DELAYS – ALL operations will require travel to be reduced to alternating one-way travel around the construction packages. Traffic control personnel will be present to assist in maintaining traffic flow.  Motorists should anticipate traffic delays while traveling through the project and plan accordingly.  Please allow for extra time in your travel plans.
Contact Francine Perkins, Public Relations Officer, FRP Enterprises, LLC with any questions or concerns with regards to the project at 802-479-6994 or for a more up to date schedule visitwww.roadworkupdates.com.