Posted: 06 Sep 2013 09:09 AM PDT
Work Update
Weathersfield Route 12/131
AOT Project No: STP 2913(1)
Saturday, 9/7/13 – Crews will be reclaiming the existing roadway between Gulf Road (W) and Downer’s Corners. This section will not be complete by the end of the day. They will return later in the week to finish.
Pike will be monitoring the reclaimed (gravel) roadway over the weekend and applying water for dust control.
Week of September 9th, 2013
Traffic Safety Warning – Crews
are asking motorists who are exiting driveways or businesses on Route
131 to be aware that they may be pulling into a construction zone. With
construction zones taking up to a mile of one lane, a flag person may
not be stationed in the exact area to assist someone in pulling out. If
there is no flagger present, motorists should wait for traffic flow in
the direction they want to go before pulling out.
The construction zone will be marked with orange cones along the centerline.
VT Route 12 – I91 Interchange to NH Border
Crews
will be rebuilding traffic islands at the junction of Routes
5/12/131. This work will extend through the end of the week and will
require alternating one-way traffic at various times. Traffic control
personnel and Uniformed Officers will be present to assist in
maintaining traffic flow.
VT Route 131 – I91 Interchange to Downer’s Corners
Henry Gould Road – Tuesday/Wednesday
- Crews will be lining the culvert at Henry Gould Road. This work may
extend into the evening hours in an effort to complete the lining
process.
Access
to Henry Gould Road will remain CLOSED while crews are working on the
Culvert. Motorists are encouraged to use Ascutney Notch Road to access
Henry Gould Road.
Gulf Road (w) to Downer’s Corners –
Reclaiming will continue mid-week through the end of the week in an
effort to complete the reclamation work on the project. Reclaiming
consists of rototilling the existing milled pavement leaving the roadway
a gravel surface. Motorists are encouraged to reduce speed and use
caution when driving over the gravel roadway.
Thrasher Road to Henry Gould Road – Guardrail crews will be working in various areas throughout this area.
I91 Interchange west to Jarvis Road – Grading/Gravel – Monday through mid week, crews will be delivering gravel to the project and grading to reshape the roadway.
TRAFFIC DELAYS – ALL operations will
require travel to be reduced to alternating one-way travel around the
construction packages. Traffic control personnel will be present to
assist in maintaining traffic flow. Motorists should anticipate traffic delays while traveling through the project and plan accordingly. Please allow for extra time in your travel plans.
Contact
Francine Perkins, Public Relations Officer, FRP Enterprises, LLC with
any questions or concerns with regards to the project at 802-479-6994 or
for a more up to date schedule visitwww.roadworkupdates.com.